Package
PROSTART® — pre-starts that won't let a job start unsafe.
Operators scan, check and confirm safety before the machine can move. Cross-vendor immobilisation across every hardwired tracker we sell. Maintenance / servicing, inductions and HammerTech integration bundled in.
What's included
Three shipped solutions.
PROSTART® pre-starts
Cross-vendor pre-start with immobilisation across Digital Matter, TrakaX®, Teltonika and Ruptela hardware. Managed 6-stage rollout.
PROSTART® pre-starts →Maintenance
Work orders, parts inventory, hours- and calendar-based servicing triggers. Paperless.
Maintenance →Inductions
Operator competency questionnaires — YouTube / PDF training with scored MCQ gating.
Inductions →Integrates with HammerTech.
Operators and their tickets sync from HammerTech into PROSTART®. If an operator's ticket for the machine has expired, the pre-start doesn't run.
How it fits together
One week in the yard, from the pre-start to the work order
Play the week, or pick any box to see what it does and what it hands on. The dashboard, notifications and reports along the bottom serve every Teletrack package, and the dashed boxes belong to the other packages.
- Tickets before the checklist. The operator scans the QR sticker on the excavator. The pre-start opens its checklist only if they hold the tickets the machine is set to need; missing inductions show as a warning.
- A failed check raises a work order. A hydraulic hose is weeping. The operator answers No and adds a photo; that question is set to raise a draft work order, and the failure alert emails the workshop.
- A pass unlocks the machine. On the skid steer, every answer passes. If its pre-start mode immobilises it, the pass sends the command that lets the machine start.
- Use without a pre-start is flagged. At the end of use, ignition data closes the pre-start. A machine used without one can raise the pre-start breach notification, and the pre-start breach report lists it.
- Engine hours bring a service due. The loader passes 250 hours. Its service rule reads the hour meter and raises a draft work order with the service guide.
- Licences come in from HammerTech. For a linked HammerTech project, workers and their licences are copied in every five minutes, ready for the pre-start ticket check.
- Billing the work. A completed work order for a customer's machine can raise a quote or an invoice in Billing.
- Into the dashboard, notifications and reports. Pre-starts and work orders have their own cards on the home dashboard, rules on the Notifications page and reports on the Reports page, the same pages the trackers use. The induction report sits beside them.
Every hand-off on the map, in words
- Inductions to Pre-starts: A machine's pre-start doesn't open its checklist for an operator without the tickets that machine is set to need. Missing inductions show as a warning.
- Pre-starts to Maintenance: A failed answer on a question set to raise one creates a draft work order, with the answers and photos, and an email goes to the people on the failure alert.
- Pre-starts to Telematics: On a machine whose pre-start mode immobilises it, a passed pre-start sends its tracker the command that lets it start; it locks again after use, depending on the mode.
- Telematics to Pre-starts: Ignition data closes the pre-start at the end of use, and a machine used without one is flagged as a pre-start breach.
- Telematics to Maintenance: Service rules read each machine's hour meter and odometer every five minutes and can raise a draft work order when a service falls due.
- HammerTech to Inductions: Every five minutes, workers and their licences come in from linked HammerTech projects.
- Pre-starts to HammerTech: Completed and failed pre-starts go to HammerTech as inspections, where the project is set to send them.
- Inductions to Workforce: Dispatch checks the same tickets and inductions on its run sheets.
- Maintenance to Billing: A work order can raise a quote or an invoice in Billing.
- Pre-starts to For every package: Pre-starts has a dashboard card; the pre-start failure, breach and overridden notification rules; and the pre-start breach, pre-start summary and driver-ID usage reports.
- Maintenance to For every package: Maintenance has the work orders, service notifications and parts low stock cards; the maintenance check failure rule; and the service history, service due, service completion and work orders reports.
- Inductions to For every package: The induction report is on the Reports page and can be scheduled. A client administrator switches on induction and licence reminder emails in Inductions, under Compliance reminders.
Pricing — two paths.
PROSTART® basic: $5 / device / month (bundled into Track + Safety at $26.90). PROSTART® with immobilisation: $15 / device / month (bundled into Track + PROSTART® at $31.90).
Want a walkthrough tailored to your fleet?